Stockport Hydro is not connected to the adjacent site and the work there is not related to the problems they have had with one of our turbines. The failure was not from design but faulty concrete work supporting the underwater bearing and this has now been rectified. Investigation work on the second turbine is planned when the river drops low enough for only one turbine. Some remedial work is envisaged for this one also.
New Mills Torrs Hydro have suffered a bearing failure. Theirs is an earlier design than Stockport Hydro which has grease-lubricated bearings and not water-lubricated. They are currently upgrading theirs to the new standard but have been delayed by high river levels, just as Stockport was. Work has started but has been hampered by the winter storms filling the entire site with silt, but the new bearing should be fitted in the next few weeks.