The point I was making Andrew is that while the facilities are so poor at Romiley, and I go to various classes, the gym and pool about four times a week, it is important that there is greater urgency about moving the Marple facility forward. As a wrinkly I expect I will be dead before the facility is up and running.
I'm really not sure what your point is. You say there are issues at Romiley. There are. I know it, you know it, the council know it. But it's not like everyone is sat there doing nothing. The roof has been fixed. The work to sort out the flooding is being done now. They have a refurbishment planned for this year. It's all go. If all goes well, the gym won't flood again and by this time next year Romiley should be looking amazing. This is good! The things you are rightly complaining about are being sorted out. That's great! So let's not worry about Romiley cos there should be nothing to worry about.
Back to Marple, to be realistic, even if everything was done for Marple, it's not going to be built this year. It's a far bigger project. Money to obtain, demolition, relocation of facilities temporarily, new buildings, the Civic Society being in uproar about something trivial, and so on. It took Tameside about five years to build the new Denton pool. And that was with a plan to replace the facility, a new location that was pretty much unused and empty, and an existing facility that could solider on for a bit longer. And contractors. Tameside have had a whole heap of problems with building an extension with a 25m pool in it at Hyde Leisure Pool due to issues finding someone to do the work.
Marple closed abruptly almost two years ago. Frankly I don't expect us to see a new facility in Marple for another three. I hope not but maybe four. But at least for some of that time, we will be able to use a far nicer Romiley.